2018 Micro Surfacing (2018-103)

Project Description

The City of Apple Valley’s 2018 capital improvement plan identifies $446,500 for street preservation in the form of micro surfacing. The work consists of applying a thin wear-resistant layer of oil and rock mixture that helps prevent pavement oxidation and seepage of moisture into the pavement surface. It is anticipated that approximately 74,111 square yards of street will be micro surfaced including portions of the following neighborhoods and streets:
  • Hyland Pointe Shores 1st and 2nd Addition
  • Apple Ponds 1st, 2nd, 3rd, and 4th Addition
  • 131st Circle cul-de-sac bulb
  • Garden View Drive
  • Galleria Place cul-de-sac bulb
  • Grand Oak Court cul-de-sac bulb
  • Gaslight Drive from 157th Street West to 155th Street West
  • Garrett Drive from 157th Street West to end of cul-de-sac