The week of June 26, Public Works will be conducting fire hydrant flow testing at 40 locations throughout the City as part of hydraulic water modeling for the Comprehensive Plan Water System update.A pressure monitor will be installed on the hydrant at each location, and the hydrants on each side are operated and the pressures recorded. Information obtained from the flow testing will be used in the modeling evaluation. In all, 120 hydrants will be operated (flushed) to capture testing data.